A design brief format that sets a school up before concept design starts
A design brief is the promoter’s written instruction to the architect: what to build, for whom, to what standard, at what cost and by when. A weak brief leads to redesign, affiliation problems and a campus that does not suit how the school teaches. This Word format gives a school promoter one document to write it in, with a prompt for every decision the design team will ask about.
What is inside
- Project and site. Objectives, board and grades, site, regulatory framework, affiliation and an approvals tracker.
- Vision and demand. Educational philosophy, class size, sections, fee band and a competitor schools table.
- Student numbers and area programme. Strength by stage and an area programme table.
- Learning spaces. A schedule of classrooms, laboratories, library, art, music, makerspace and hall with sizes and capacities.
- Sports, administration and support. Playground, courts, early-years play, staff rooms, medical room, canteen and toilets.
- Safety and transport. Child safety by design, fire and evacuation, accessibility, bus bays and pick-up queues.
- Environment and services. Thermal comfort, ventilation, daylight, power, water and rating targets.
- Cost, programme and team. Cost target and budget by head, six stages with a client decision at each, consultant roles, review process and change control.
- Appendices. Sign-off and revision history, a completeness check to run before issue, and a glossary.
Built for Indian schools
The format works for CBSE, ICSE, IB, Cambridge and state board schools. It uses INR cost targets and Indian approvals such as state education NOC, fire NOC and board affiliation. It refers to the National Building Code of India, NEP 2020 and the RPwD Act 2016.
Who it is for
School trusts, promoters and developers who brief architects, and architects who want a clear brief from their client before they start.
File details
- Format: Word (.docx), A4, 16 pages
- Fully editable, with fill-in fields in [square brackets] and guidance boxes you delete before issue
Good to know
This format helps you ask the right questions. It does not give you the answers. Board affiliation norms, FSI, setbacks, height limits and fire requirements depend on your board, state, authority and plot, so confirm them with your architect and the relevant authority. General guidance only, not legal advice. Licensed for use on your own projects. Not for resale or sharing.







Reviews
There are no reviews yet.