A feasibility checklist for data centre projects, from land screening to decision
For a data centre, time to power, resilience and the anchor customer decide the outcome long before the building does. This Excel workbook gives a developer or investor one place to test a data centre project before land is bought or funds are committed.
What is inside
- Start Here. Instructions, project details, a legend and a worked example row.
- Core Checklist (61 checks). Strategy, land and site, planning and regulatory, market and demand, design and programme, development cost, revenue, funding, appraisal and risk, and the decision gate.
- Data Centre (27 checks). IT load and phasing, customer type and anchor tenant, revenue model, rack density, grid capacity and time to power, power price, redundancy, resilience target, cooling and efficiency, connectivity, site hazards, fire suppression, cost per MW, long-lead equipment, permits, data rules, commissioning and plant refresh.
- Summary. Live count of items done, open Critical items and a readiness verdict.
How it works
Work through the Core Checklist and then the Data Centre tab, and set the status of each item. A project reads as ready for a decision when no Critical item is open and at least 90 percent of the applicable items are done. The threshold can be changed in the Summary formulas.
File format
One editable Excel workbook (.xlsx), formatted for A4 landscape printing. It opens in Microsoft Excel, Google Sheets and LibreOffice.
This checklist is a planning aid. It does not replace legal, tax, financial, technical or planning advice. Rules differ by country and city, so check each item against current local requirements.